Revista de Obras Públicas

Portada del Número 3475 (Monográfico)

Revista de Obras Públicas

2007 / Número 3475: XXII CIGP (Barcelona) (Monográfico)

La Presa del Arenoso

The Arenoso Dam

Romero Alcón, Francisco; Bobis Cañal, Alfonso; García Palacios, Juan José; David J. Cruz García.

Director de las Obras (AQUAVIR). Fr_alcon@aquavir.com; Asistente al Ingeniero Director de las Obras (AQUAVIR). abobis@aquavir.com;Asistencia Técnica (INITEC). jgpalacios@infraestructuras.initec.es; Asistencia Técnica (PYCSA). dcruz@pycsa.es

Fuente: 2007, 154 (3475):149-160

Resumen en español

El embalse del Arenoso, integrado dentro de las actuaciones del Programa A.G.U.A. del Ministerio de Medio Ambiente, está destinado al abastecimiento del bajo Guadalquivir, enmarcado en la regulación general del río. La presa que lo crea está emplazada en el río del mismo nombre, afluente del Guadalquivir por margen derecha, y situada próxima a la desembocadura en el término municipal de Montoro, provincia de Córdoba, a unos 41 km al noreste de la capital, teniendo un acceso en el PK 364 de la autovía A-4. La obra principal consiste en una presa de materiales sueltos zonificada, con núcleo central de arcilla y espaldones de grauwacas y pizarras. El núcleo lleva adosado un material de filtro aguas abajo y un material de transición aguas arriba. Asimismo dispone de una ataguía de materiales y sección tipo similares, que queda incorporada al cuerpo de presa. La altura de la presa es de 80 m, la longitud de coronación es de 1.480 m, y su construcción ha requerido el empleo de un volumen de materiales superior a los tres millones de metros cúbicos, creando una barrera impermeable al paso del agua capaz de almacenar en torno a 160 Hm3, como embalse útil. Para vigilancia y control de filtraciones, dispone la presa de una galería perimetral, que recorre el cimiento. También se han practicado numerosos tratamientos en el terreno de cimentación, consistentes en pantallas e inyecciones, algunos de los cuales se han ejecutado previamente y durante la ejecución del cuerpo de presa la mayoría. En un edificio adosado al paramento de aguas abajo de la presa, se ha construido una central de bombeo y turbinación, pieza clave para la regulación del Guadalquivir mediante bombeo, aprovechándose también la energía de los caudales desaguados a través de la turbina. La presa dispone también de un aliviadero de labio fijo con el umbral a la cota 209, y 24 m de longitud, con capacidad de evacuación de caudales hasta 500m3/s al NAE. Los desagües profundos se componen de dos conducciones con capacidad de evacuación de 80m3/s a embalse lleno. El proyecto contempla asimismo la mejora de los caminos de la zona. Actualmente la presa se encuentra en ejecución, siendo la Sociedad Estatal Aguas de la Cuenca del Guadalquivir S.A., la empresa promotora y Dirección de Obra, Dragados S.A. la empresa constructora, y las empresas Técnicas Reunidas y Proyecto y Control, en UTE, las encargadas de la Asistencia Técnica y Control y Vigilancia de las obras. Los trabajos comenzaron en abril del año 2004, estando prevista su finalización durante el mes de marzo del año 2007.

Palabras clave:

Presa, Núcleo, Arcilla, Espaldón, Aliviadero, Avenida, Filtro, Ataguía, Coronación


Abstract

Arenoso reservoir, integrated on A.G.U.A. program, which belongs to Environment Ministry, is destined to downstream Guadalquivir’s water supply, and framed on the general regulation of the river. The dam which creates the water reservoir is located on the same name river, Guadalquivir’s right margin affluent and its mouth is next to the Montoro’s municipal district, 41 km northeast of Cordova, and having an access at 364km of the A-4 motorway. The main work consists on an embankment dam, with central clay core, and slates and greywacke shoulders. The core is covered downstream by a filter material and upstream by a transition material. Likewise it has a cofferdam with similar section and materials, that remains leaned against the dam’s body. The dimensions of the dam are 80 m high, 1.480 m long at its crest, and in its construction have been used more than 3 million m3 of materials, creating a waterproof barrier able to keep 160 hm3 as a useful reservoir. To watch over seepage and control it, there has been constructed a perimeter gallery in the dam’s foundation. The surrounding soil has been treated by means of screens and injections, some of them previously done and most of them meanwhile the dam’s body construction. Leaned against the downstream dam’s face there has been constructed a building containing a pumping and turbine central. This is a key element to the Guadalquivir’s pumping regulation and also for the exploitation of the energy provided by the flow drained into the turbine. The dam has an uncontrolled spillway with its crest at the 209 level, 24 m long, and outlet flow capacity nearly 500 m3/s with the water level placed at PMF level. The deep outlets are two circular pipes with 2.000 mm and 2.500 mm in diameter and 80 m3/s outlet capacity with the full reservoir. The project also includes environmental measures, road access and refurbishment of the area paths and roads. Nowadays the dam is under construction, being the Sociedad Estatal Aguas de la Cuenca del Guadalquivir S.A. the property, Dragados S.A. the builder, and the joint-venture Técnicas Reunidas – Proyecto y Control in charge of the technical assistance and construction supervision of the works. The construction was begun in April 2004 and its conclusion foreseen in March 2007.

Key words:

Dam, Core, Clay, Shoulders, Spillway, Flood, Filter, Cofferdam, Crest


Descargar artículo a texto completo en formato pdf Artículo a texto completo en formato PDF
Volver a la lista de artículos Volver a la página anterior


1 artículo publicado en esta revista por: Romero Alcón, Francisco

La Presa del Arenoso
2007, 154 (3475):149-160


1 artículo publicado en esta revista por: Bobis Cañal, Alfonso

La Presa del Arenoso
2007, 154 (3475):149-160


1 artículo publicado en esta revista por: García Palacios, Juan José

La Presa del Arenoso
2007, 154 (3475):149-160


1 artículo publicado en esta revista por: David J. Cruz García.

La Presa del Arenoso
2007, 154 (3475):149-160

Realización del Colegio de Ingenieros de Caminos, Canales y Puertos con la participación del CINDOC.
Con la colaboración del CEDEX-CEHOPU y la Escuela Técnica Superior de Ingenieros de Caminos, Canales y Puertos de Madrid

Colegio de Ingenieros de Caminos, Canales y Puertos (España) Centro de Estudios y Experimentación de Obras Públicas (CEDEX) Escuela Técnica Superior de Ingenieros de Caminos, Canales y Puertos Asociación Española de Túneles y Obras Subterráneas (AETOS)

© Copyright: Colegio de Ingenieros de Caminos, Canales y Puertos (España)

Propiedad del Colegio de Ingenieros de Caminos, Canales y Puertos (España). Prohibida toda reproducción total o parcial sin citar la fuente.
Property of the Colegio de Ingenieros de Caminos, Canales y Puertos (Spanish Society of spanish engineers). Reproduction by whatever means of the whole or any part of the content is strictly forbidden without reference to source