Lefler Pino, Joaquín
Dr. Ingeniero de Caminos, Canales y Puertos. Ex-Director del Puerto de Algeciras-La Línea.
Fuente: 2009, 156 (3501): 61-72
Resumen en español
Se describen las obras portuarias realizadas a principios del siglo XX para con urgencia disponer de una base naval poderosa. Durante años se luchó para contar con un dique de carena, y finalmente se construyeron tres diques de abrigo, muelles, tres diques de carena, almacenes, talleres, etc. Eran los prolegómenos de la I Guerra Mundial.
Palabras clave:
Gibraltar; Estrecho de; Bahía de Algeciras; Arsenal de Gibraltar; Royal Navy
Abstract
The article describes the urgent dock works conducted at the beginning of the 20th century to provide a powerful naval base. Attempts had been made for many years to provide a graving dock and the dockyard was finally fitted with three moles, jetties, three graving docks, workshops, stores and offices, etc. The First World War was about to break out.
Key words:
Gibraltar; Straits of; Bay of Algeciras; Gibraltar dockyards; Royal Navy
1 artículo publicado en esta revista por: Lefler Pino, Joaquín
El Nuevo Arsenal de Gibraltar
2009, 156 (3501): 61-72
Realización del Colegio de Ingenieros de Caminos, Canales y Puertos con la participación del CINDOC.
Con la colaboración del CEDEX-CEHOPU y la Escuela Técnica Superior de Ingenieros de Caminos, Canales y Puertos de Madrid
© Copyright: Colegio de Ingenieros de Caminos, Canales y Puertos (España)
Propiedad del Colegio de Ingenieros de Caminos, Canales y Puertos (España). Prohibida toda reproducción total o parcial sin citar la fuente.
Property of the Colegio de Ingenieros de Caminos, Canales y Puertos (Spanish Society of spanish engineers). Reproduction by whatever means of the whole or any part of the content is strictly forbidden without reference to source