Revista de Obras Públicas

Portada del Número 3484 (Monográfico)

Revista de Obras Públicas

2008 / Número 3484: X Premio Internacional Puente de Alcántara (Monográfico)

Aprovechamiento Hidroeléctrico de Irapé en Brasil

Flávio Fernandes Novaes, Tibiriçá Gomes de Mendonça, Enio Marcus Brandão Fonseca,Sérgio Luiz C. Fernandes, Andréia Cássia Pinto P. de Almeida, Wilson Roberto Grossi,José William Campomizzi, Romildo Dias Moreira Filho, Mônica Neves Cordeiro

Fuente: 2007, 155 (3484): 56-80

Resumen en español

La Presa de la Hidroeléctrica de Irapé, concluida en el 2006, con 208 metros de altura y 550 metros de longitud, es la presa más alta de Brasil y la segunda del continente sudamericano y la más grande del mundo de escollera con núcleo de arcilla. Con una inversión total de R$ 1,4 billones de “reais” [reales] (más de 520 millones de euros), está localizada en la región sudeste de Brasil, en la región nordeste del estado de Minas Gerais, en el tramo medio del Valle del río Jequitinhonha, entre los municipios de Berilo en la margen derecha y Grão Mogol en la izquierda. Se trata de una infraestructura estratégica porque, a través de su capacidad de producción de energía y generación de renta, permite la incorporación de la región al proceso de desarrollo socioeconómico del país y el aumento del indicador IDH, Índice de Desarrollo Humano, de la misma. La central, con 360 MW de potencia instalada, posee un embalse que forma un gran lago de 137,16 km2 de superficie y capacidad de almacenaje de 5.963.920 Hm3, aprovechando un desnivel natural de 185,00m en una zona de relieve bastante accidentado, del tipo canyon, con una geología adversa con altos contenidos de minerales sulfurosos presentes en las rocas del tipo cuarzo, mica, y pizarra grafitosa en el lugar de la implantación. Por esta razón, se optó por impermeabilizar todos los contactos entre el hormigón y la roca, estableciendo una zonificación apropiada de la presa y utilizando áridos libres de sulfuros en la composición del hormigón. Debido al relieve accidentado se utilizaron alternativas de accesos en túneles y estructuras subterráneas para los conductos forzados y para el canal de los aliviaderos. Fueron necesarias soluciones innovadoras de ingeniería para poder convivir con las cuestiones de drenaje ácido, resultante de la oxidación de los minerales sulfurosos, además de las dificultades constructivas surgidas al tratarse de un valle muy encajado. Localizada en una de las regiones más necesitadas del país, Irapé exigió tecnologías de punta en lo que se refiere a los trabajos con las comunidades rurales afectadas por la obra, con el menor impacto ambiental y social posible.

Palabras clave:

Ingeniería de Represa; Aprovechamiento Hidroeléctrico; Irapé;Generación de Energía; Rocas con sulfuros; Geotecnia; Hormigón; Presas


Abstract

The 208 m high and 550 m long Irapé Dam, completed in 2006, is the highest dam in Brazil, the second highest in the South America and the largest earth core rockfill dam in the world. The dam which cost R$ 1.4 billion (over 520 million euros), is located in southeast Brazil, in the northeast of the State of Minas Gerais, in a central section of the River Jequitinhonha Valley set between the districts of Berilo, on the right bank and Grão Mogol on the left bank. This plant forms a strategic infrastructure guaranteeing energy and ensuing income generation and one that will enable the incorporation of the region within the socio-economic development of the country and raise the Human Development Index (HDI) in the region. The plant, with its 360 MW installed capacity, has a 137.16 km2 impounding reservoir with a 5,963,920 hm3 storage capacity, and exploits a 185 m natural head in an abrupt gorge. The geological characteristics of the site are geochemically adverse on account of the large proportion of sulphur bearing minerals present in the quartz, mica, shale and graphite rock. On account of these characteristics, an impermeable lining was formed between the concrete and the rock, establishing suitable zonification of the dam and employing sulphur free aggregates in the concrete mix. On account of the irregular nature of the terrain, alternatives in the form of tunnel accesses and underground structures were employed for the penstock and spillway. Innovative engineering solutions were required to overcome the problem of acid drainage, arising from the oxidization of the sulphurous minerals, and to offset the construction difficulties posed by the very closed-in nature of the valley. The Irapé Dam is set in one of the poorer regions of the country and required state-of-the art technology to ensure minimum environmental and social impact to the affected rural communities in the area.


Descargar artículo a texto completo en formato pdf Artículo a texto completo en formato PDF
Volver a la lista de artículos Volver a la página anterior


1 artículo publicado en esta revista por: Flávio Fernandes Novaes, Tibiriçá Gomes de Mendonça, Enio Marcus Brandão Fonseca,Sérgio Luiz C. Fernandes, Andréia Cássia Pinto P. de Almeida, Wilson Roberto Grossi,José William Campomizzi, Romildo Dias Moreira Filho, Mônica Neves Cordeiro

Aprovechamiento Hidroeléctrico de Irapé en Brasil
2007, 155 (3484): 56-80

Realización del Colegio de Ingenieros de Caminos, Canales y Puertos con la participación del CINDOC.
Con la colaboración del CEDEX-CEHOPU y la Escuela Técnica Superior de Ingenieros de Caminos, Canales y Puertos de Madrid

Colegio de Ingenieros de Caminos, Canales y Puertos (España) Centro de Estudios y Experimentación de Obras Públicas (CEDEX) Escuela Técnica Superior de Ingenieros de Caminos, Canales y Puertos Asociación Española de Túneles y Obras Subterráneas (AETOS)

© Copyright: Colegio de Ingenieros de Caminos, Canales y Puertos (España)

Propiedad del Colegio de Ingenieros de Caminos, Canales y Puertos (España). Prohibida toda reproducción total o parcial sin citar la fuente.
Property of the Colegio de Ingenieros de Caminos, Canales y Puertos (Spanish Society of spanish engineers). Reproduction by whatever means of the whole or any part of the content is strictly forbidden without reference to source